Services/Commercial Construction
Commercial construction for owners, tenants and investors

Commercial Construction

Canberra ACT·Brisbane QLD·Service 01 / 04

New-build commercial projects need early cost clarity, disciplined procurement and a site team that can manage authorities, consultants and trades without losing programme control. Moltus delivers commercial construction from feasibility through to commissioning and defects close-out.

10+
Years experience
ISO
Accredited systems
100%
Repeat & referred clients
0
Notifiable safety incidents
How We BuildMoltus
How We Build

How we run a commercial build.

Every commercial construction project we take on is set up around early cost certainty, controlled procurement and a disciplined site team. We get involved before drawings are final so risk, sequencing and authority approvals are mapped before the first trade is engaged.

01

Early cost clarity before tender

We work alongside your consultants in design to test buildability and lock target costs before procurement, so funding decisions are made on real numbers — not optimistic estimates.

02

A site team that owns the programme

Our site managers run weekly look-ahead programmes, trade coordination and authority liaison so the build holds its dates through ground works, structure, services and fit-off.

03

A clean handover, then a managed defects period

Commissioning, certification, training and the 12-month defects liability period are scheduled as part of the build — not bolted on after practical completion.

Plan a new build
DeliveryMoltus
Construction Delivery Models

Contract structures for commercial builds.

Choose the construction model that fits your documentation, risk profile and funding pathway — from lump sum certainty to early contractor involvement before tender.

01

Lump Sum

Fixed-price delivery against a fully documented design — certainty for tenants and lenders.

02

Construction Management

Open-book delivery with transparent trade packages, real-time cost reporting and shared savings.

03

Design & Construct

Single point of accountability across design, approvals and construction for faster outcomes.

04

Early Contractor Involvement

Buildability, programme and cost advice during design — de-risking projects before tender.

What We BuildMoltus
What We Build

Commercial typologies we deliver.

Our team is set up for commercial buildings where governance, safety and reporting matter — projects with multiple stakeholders, formal approvals and long-life assets.

01

Office, mixed-use and tenant base-build

Multi-storey commercial offices, mixed-use ground-plane retail and tenant base-builds where landlord, fund manager and incoming tenant programmes all need to align.

02

Government and education facilities

Procurement-compliant builds for ACT and Commonwealth agencies, schools, training centres and tertiary facilities — delivered under formal probity, safety and reporting regimes.

03

Health, community and civic buildings

Clinics, allied-health hubs, community centres and civic facilities where infection control, accessibility and after-hours operation drive sequencing and finish quality.

Discuss your typology
ProcessMoltus
How We Deliver

A construction process built for certainty.

Commercial construction moves through clear gates: feasibility, design coordination, procurement, construction, commissioning and a managed defects period.

Stage 01

Discovery & feasibility

We sit with you to understand the brief, site constraints, programme and budget envelope.

Stage 02

Design coordination

We work alongside your design team — providing buildability, cost and programme advice.

Stage 03

Procurement

Trade packages tendered to a vetted Canberra and Brisbane subcontractor base.

Stage 04

Construction

Delivery under ISO-accredited safety, quality and environmental systems.

Stage 05

Commissioning & handover

Staged commissioning, asset registers, O&M manuals and warranties.

Stage 06

Defects & aftercare

12-month defects liability supported by a dedicated post-handover team.

Why MoltusMoltus
Why Moltus

Why choose Moltus for your commercial build.

Commercial construction comes down to whether your builder can hold cost, programme and quality at the same time. That is what we are set up to do.

01

Cost certainty backed by buildability

We test the design before tender, flag risk early and lock target costs so the contract value you sign is the value you finish on — not a starting point for variations.

02

Programme discipline on site

Weekly look-aheads, controlled trade engagement and visible authority milestones mean the build keeps moving through structure, services and finishes.

03

ISO-accredited governance

We operate under ISO 9001, 14001 and 45001 — quality, environment and safety systems your funders, agencies and tenants can audit at any point in the build.

Talk to Moltus about your build
Recent Work

Projects you can point at.

See all projects
Hugo Law — Office Fitout
Commercial Fitout

Hugo Law — Office Fitout

7 London Circuit, Canberra ACT
Size: 350 sqm · Value: $300k
Canberra Advice — Office Fitout & Façade Upgrade
Commercial Fitout

Canberra Advice — Office Fitout & Façade Upgrade

Canberra ACT
Size: 150 sqm · Value: $300k
Taqwa School — Multi-Stage Works
Education

Taqwa School — Multi-Stage Works

Moncrieff, Canberra ACT
Size: 2,000 sqm · Value: $1.4M
Next step

Planning a commercial construction project?

Send through the site, drawings or early brief and we'll help map the right construction pathway, risk position and next steps.

Start a conversation